Concrete and steel quantity takeoff from structural drawings (DWG)

via Freelancer ·

Budget / Salary$10–20
TypeFreelance project
LocationRemote
Posted1 hour ago
I need an experienced quantity surveyor to calculate concrete and rebar quantities from my structural CAD drawings (two DWG files, to be attached).

Scope:
- Full concrete takeoff by element (foundations, columns, beams, slabs, walls) in m3
- Reinforcement steel takeoff by element and bar diameter in kg/tons
- Clean Excel BOQ with element references matching the drawing grids/levels

Requirements: Proven quantity takeoff experience on structural RC projects; work directly from DWG (AutoCAD); share one sample of a previous takeoff.

Budget cap: USD 20. Delivery: within 24 hours.
excel cad/cam building architecture civil engineering structural engineering autocad construction management quantity surveying
Apply on Freelancer →

Project sourced from Freelancer.com. Applications happen directly on the original platform — we never collect your data.