Concrete and steel quantity takeoff from structural drawings (DWG)
Budget / Salary$10–20
TypeFreelance project
LocationRemote
Posted1 hour ago
I need an experienced quantity surveyor to calculate concrete and rebar quantities from my structural CAD drawings (two DWG files, to be attached).
Scope:
- Full concrete takeoff by element (foundations, columns, beams, slabs, walls) in m3
- Reinforcement steel takeoff by element and bar diameter in kg/tons
- Clean Excel BOQ with element references matching the drawing grids/levels
Requirements: Proven quantity takeoff experience on structural RC projects; work directly from DWG (AutoCAD); share one sample of a previous takeoff.
Budget cap: USD 20. Delivery: within 24 hours.
Scope:
- Full concrete takeoff by element (foundations, columns, beams, slabs, walls) in m3
- Reinforcement steel takeoff by element and bar diameter in kg/tons
- Clean Excel BOQ with element references matching the drawing grids/levels
Requirements: Proven quantity takeoff experience on structural RC projects; work directly from DWG (AutoCAD); share one sample of a previous takeoff.
Budget cap: USD 20. Delivery: within 24 hours.
Apply on Freelancer →
Project sourced from Freelancer.com. Applications happen directly on the original platform — we never collect your data.