Electrical / MEP Estimator – Data Center Construction (Freelance / Remote)

via Freelancer ·

Budget / Salary€250–750
TypeFreelance project
LocationRemote
Posted1 day ago
We are seeking an experienced freelance Electrical / MEP Estimator or Quantity Surveyor to provide detailed BOQ analysis, labour calculations and cost estimating for an upcoming data center project in Finland.

Project Scope

The tender covers several installation packages:

LV POD and BOH POD: Electrical equipment installation, UPS and battery systems, auxiliary power connections, sealing, associated works and commissioning.

DC Power Cabling: Installation of large-section copper cables (185 mm²), terminations, cable lugs and associated testing.

Busbar Systems: High-current busway systems (3200 A and 5000 A), including installation, testing and commissioning.

Associated MEP Works: Cooling-unit installation, pipework connections, structural installation and related interfaces.

Applicants may quote for individual packages if they do not have the expertise to estimate the full scope.

Required Services

A structured Excel BOQ, available technical specifications and supporting drawings will be provided.

The estimator will be responsible for:

Reviewing BOQ quantities and identifying discrepancies, missing information and overlapping scope.

Calculating realistic installation labour hours, crew composition and productivity for each activity.

Preparing detailed material, equipment, consumables and subcontractor costs where applicable.

Distinguishing between client-supplied and contractor-supplied materials.

Including supervision, project management, access equipment, logistics, testing and commissioning allowances.

Preparing unit rates, package subtotals and overall project cost estimates.

Documenting assumptions, exclusions, provisional allowances and technical clarifications.

Identifying commercial risks, double pricing and opportunities for cost optimization.

Existing installation productivity norms and labour-cost assumptions will be provided as the estimating basis. Any proposed adjustments must be clearly justified.

Required Deliverables

Fully editable, unlocked Excel estimate with transparent formulas.

Detailed breakdown of labour hours, labour costs, materials, equipment and other allowances.

Separate calculations for each work package.

Summary showing total estimated costs, assumptions, exclusions and outstanding clarifications.

Short PDF summary of the estimate.

Required Experience

Proven electrical or MEP estimating experience on large commercial, industrial or data center construction projects.

Strong knowledge of LV installations, heavy power cables, terminations, UPS systems and busbars.

Experience with European construction projects and relevant IEC/EN standards.

Ability to calculate installation man-hours rather than relying solely on generic unit-rate assumptions.

Advanced Excel skills and experience interpreting technical drawings and specifications.

Previous data center estimating experience is strongly preferred.

Working Arrangement

Remote, project-based freelance assignment, with the possibility of further assignments.

Fixed-price proposals are preferred, although hourly quotations will also be considered.

When applying, please provide:

Relevant electrical/data center estimating experience.

Examples of comparable projects or anonymized estimating work.

Hourly rate or proposed fixed-fee pricing.

Expected turnaround time.

Confirmation of which work packages you can competently estimate.

Detailed tender documentation will be shared with shortlisted candidates under confidentiality arrangements.
excel electrical engineering bill of materials (bom) analysis quantity surveying
Apply on Freelancer →

Project sourced from Freelancer.com. Applications happen directly on the original platform — we never collect your data.