I have a small concrete canopy that must stay in place while its existing supports are removed. I only have photos and rough dimensions, so your first step will be to confirm design loads from that limited information and any reasonable assumptions that current codes allow.
Size 2.5 m x 1.5m from FFL First beam bottom is 3.35m and beam height is 400mm than concrete slab 200mm . Again block wall 2.6 m height. Again beam 400mm . Again slab 200 mm and final parapet wall 1 m height. Note all block used 150mm thick hollow bocks.
The immediate need is a clear set of calculations and drawings for temporary shoring that will safely support the canopy during demolition of the old supports. Once the canopy is secure, I also need a full design package for two new columns and an isolated footing sized to carry the calculated loads.
Please include:
• Load-take-down and structural analysis for the concrete canopy
• Sketches or CAD details for the temporary support system, with member sizes, spacing, connection notes, and allowable capacities
• Reinforced-concrete design of the permanent footing and two columns, complete with bar schedules and construction notes compliant with ACI/Eurocode (state which you use)
• A concise calculation report stamped “for construction” or “for review,” showing all equations, safety factors, and references
• A brief method statement outlining installation and change-over from temporary to permanent supports
PDF sheets are fine for the report and drawings; DWG or similar is preferred for editable files.
I’ll be available to clarify site photos and measurements as you progress, and I’ll review each milestone promptly so we can keep the schedule tight.
If any further details need please do contact.
Size 2.5 m x 1.5m from FFL First beam bottom is 3.35m and beam height is 400mm than concrete slab 200mm . Again block wall 2.6 m height. Again beam 400mm . Again slab 200 mm and final parapet wall 1 m height. Note all block used 150mm thick hollow bocks.
The immediate need is a clear set of calculations and drawings for temporary shoring that will safely support the canopy during demolition of the old supports. Once the canopy is secure, I also need a full design package for two new columns and an isolated footing sized to carry the calculated loads.
Please include:
• Load-take-down and structural analysis for the concrete canopy
• Sketches or CAD details for the temporary support system, with member sizes, spacing, connection notes, and allowable capacities
• Reinforced-concrete design of the permanent footing and two columns, complete with bar schedules and construction notes compliant with ACI/Eurocode (state which you use)
• A concise calculation report stamped “for construction” or “for review,” showing all equations, safety factors, and references
• A brief method statement outlining installation and change-over from temporary to permanent supports
PDF sheets are fine for the report and drawings; DWG or similar is preferred for editable files.
I’ll be available to clarify site photos and measurements as you progress, and I’ll review each milestone promptly so we can keep the schedule tight.
If any further details need please do contact.