Search results for Petroleum Engineering

Flow Assurance- 3000 Word Report And Calculations

Design of a Subsea Pipeline SystemA subsea pipeline is to be designed to transport fluids form 4 subsea production wells to a hostplatform. Peak liquid flow from the four wells is 3280 (standard) sm3/day. Dry oil andassociated gas (no significant water) is expected for the first 3 years.The wellhead temperature is constant at 50 ◦C. To avoid excessive back pressures on the reser- voir the wellhead pressure is set at 24.1bar maximum.The fluid has to be delivered to the topsides…
Full Description of Flow Assurance- 3000 Word report and Calculations

 

© 2005 - 2019 getFreeLancer.com
10,399 contracts/jobs/projects currently available in our database.

There are 4 users online now.
Most online ever was 1568.