Civil Engineering Estimating Project

TERM PROJECT ASSIGNMENT DESCRIPTION One-Story Single Family House (MAKU Residence)OBJECTIVE AND GENERAL REQUIREMENTSThe objective of the term project assignment is to prepare a Bid Proposal for constructing a one-story single family house (MAKU Residence).
Students must approach the assignment from the perspective of a construction contractor attending a bid, and prepare a professional price proposal using their knowledge, skills and common sense.
This requires proper efforts with regards to:Reading and understanding plans;Recognizing construction work items;Surveying the quantity for various types of work;Using cost databases to acquire cost of construction efforts;Estimating indirect and total cost of construction; andSubmitting and presenting a professional proposal of their cost estimation.
General requirements of the proposal are as following:This is an individual assignment and students will not be allowed to work in groups.
Use the project plans and other reference material posted on Canvas to identify the scope of work in this project and complete the quantity take-off.
Follow the CSI MasterFormat® (2004 Edition) in organizing the cost estimate proposal.
Use the R.
S.
Means Online website (https://www.rsmeansonline.com) to get cost data for all identified work items.
It is the students’ responsibility to follow up on the invitation email to setup an account on the R.
S.
Means Online website and to inform the instructor immediately if they have not received such email (double check your email spam folder).
In case of any missing or incomplete information, students can make reasonable and justifiable assumptions.
All assumptions must be clearly listed in the proper sections of the proposal, as described later in this document.
MINIMUM SCOPE This section describes the minimum scope of work required in this project.
This includes items from the following 11 CSI MasterFormat® divisions:Division 01:General Conditions and Requirements• Identify all general requirement items that should apply to this job, assuming 12 month duration for entire construction.
Students are encouraged to make reasonable and justifiable assumptions based on common sense and regular construction practices to cover any missing information.
Division 03:Concrete (for Slab, Footings, and Foundations)• Concrete forming and reinforcing steel, including required accessories (use separate cost items)• Concrete placement (including curing and finishing, wherever applicable)Division 04:Masonry • Masonry units and accessories (including mortar and grout, if needed) • Bond BeamsDivision 05:Metals • Wall studsDivision 06:Wood • Roof framing structure (prefabricated truss system) and sheathing • OthersDivision 07:Thermal and Moisture Protection • Below-grade moisture protection (primer, vapor barrier, protection board, coving material, etc.) • Walls (interior and exterior) and ceiling thermal insulation.
Use R-11 insulation for interior walls.• Roof Tiles and accessories Division 08: Openings • Doors and WindowsDivision 09:Finishes • All wall, flooring and ceiling finishesDivision 11:Equipment • Residential appliances such as kitchen equipment, washers and dryers, etc.
Division 31: Earthwork • Structural excavation and backfill (with compaction) – assume 2 feet of working space on all sides and excavation slope of 1:1.
Division 32: Exterior Improvements • Fencing, sidewalks and driveways …etc.
PROJECT REPORTThe final report must be submitted as a single PDF file organized in the following sections:• Cover Sheet: Your information and title of the report.• Proposal Summary Sheets: summary table of cost estimates in both CSI MasterFormat and AST Uniformat II. (see spreadsheet templates posted on Canvas).
Separate section for each CSI division, consisting of:Summary sheet including cost items identified for the division.
The description of each item should be clear and written to describe the work item not the description of the RS Means item used for pricing (see cover table template on Canvas),o Estimated cost of items and divisions, included in the above summary table. o List of all the assumptions made in order to complete the quantity takeoffs, and o Typed takeoff calculations of all quantities included in the estimate or a scanned copy of neatly written and properly-organized handwritten takeoff calculations.
You should: § Keep calculations neat and clear. § Separate calculations of different items using lines and titles. § Mention name of methods that you used in calculations (if applicable). § Show proper and adequate comments for your calculations.
In addition to the PDF file, the Microsoft Excel file used to develop the cost summary sheets mentioned above should also be submitted.
I have attached the plans and the excel sheet where all the estimating needs to be transferred.
I also need need all the calculations to be written on the paper and send it to me.
THE ESTIMATING NEEDS TO BE DONE ON THE WEBSITE RS MEANS ONLINE.2Attachments
Tags: Building Estimation, Civil Engineering

 

Similar Freelance jobs:

Estimator / Quantity Surveyor Must Speak Filipino

We are an Australian carprenty and plastering company and are looking for an experienced cost estimator for a long-term business relationship. Start asap.$$ to be confirmedRequirements• Great/business fluent English AND must speak Filipino • Carpentry (and plastering) knowledge• Experience with Planswift and Groundplan preferred • Exceptional understanding of plans and specifications • Outstanding communication skillsResponsibilities include, but are not limited• Actively participate in the management of various tenders• Review and complete the bid forms and ensure that they are within…
Full Description of Estimator / Quantity Surveyor must speak Filipino

I Need A Steel Structure Engineer, For Our One Project In Sharjah

We have 350 cubic/100 square rooms, which are fabricated with steel. so at the current time we want to make changes into it to increase the carrying capacity of the mezzanine floor. Here we looking few options (steel structure engineers) as we can get best solution.
Full Description of I need a steel structure engineer, for our one project…

BME7099- Site Surveying Assignment Part 1 & PART 2

Site surveying PART 1Task 1 Volume and area calculationsUsing the example attached DCS/S2/005, determine the areas and volumes using appropriate techniques.Task 2 Two peg testCarry out a two peg test upon an automatic level and estimate any collimation error, suggesting how it could be adjusted.(make it up please as i have not done it at uni)Task 3 Precise levellingUsing precise levelling techniques advise a client if an area of floor is within a tolerance of +/- 2.0mm over a distance…
Full Description of BME7099- Site Surveying Assignment part 1 & PART 2

Civil Engineering Coursework Help

2. Coursework report andSubmission Your coursework requires you to workindividually to answer all the questions given in Section 4. Your answersshould be presented in a concise report which should include sufficient detailto explain the methodology you adopted to answer each question. The reportshould be written in Word and include the following: •A list of all the assumptionsyou make to answer each question •The analytical or empiricalmethod you adopt to answer the question and appropriate justification of yourselection (i.e. if there…
Full Description of Civil Engineering Coursework help

BME7227- Geotechnical Engineering Assignment Help

Designing part we will share and will send it to you. You just need to do Report+ CalculationI will do 4 designs and slope software and send it to you. Writing report and showing calculations with the formula will be done by writer right
Full Description of BME7227- Geotechnical Engineering assignment help

I Am Looking For A Filipinocivil Engineer Who Estimate The Bill Of Materials For My Gas Station.

The items to be estimated are:1. Structural Works2. Plumbing works3. Electrical Works4. Mechanical Works5. Painting Works6. Sewerage Works7. Electronic WorksWe need a labor and Materials Estimate
Full Description of I am looking for a Filipinocivil engineer who estimate the…

 

Tags:

Application Programming 2d Animation Google Adword Clean Technology Wp Market Research Business Intelligence Off Page Optimization Soapui Ecommerce Platform Development Algorithm Adobe After Effects Ibm As400 Control Language Cgi Music Producing Natural Language Processing Legal Opencart Project Management Magento Jig And Fixture Design Oracle Apex Website Data Entry Autodesk Autocad Civil3d Web Mobile And Software Dev Mobile App Rotoscoping Pay Per Click Advertising Translation English Korean Google Adsense Translation English Bengali Icon Design Perl Mysql Photoshop Online Writing Content Management Cucumber Financial Modeling Product Sourcing Data Processing Blackberry App Development Pinnacle Studio Lithuanian Aweber Mechanical Design 3d Rendering Covers Packaging Medical Law Microsoft Exchange Server Business Process Execution Language Bpel Sketching Creative Writing C# Malware Mobile Marketing Character Design Financial Accounting Animation Brand Ambassador Writing Infographics Corporate Finance Corporate Taxes Appointment Setting Dns Microsoft Windows Powershell Social Media Management Adobe Premiere Creative Talent Microsoft Access Programming Sketchup Synopsis Writing Facebook Marketing Logic Pro Criminal Law Windows Nt Administration Technical Support Freelance Marketing Hvac System Design Technical Writing Leads Brochure Design Brand Licensing Arcgis Video Production Verilog Vhdl Cs Cart Blender3d Youtube Marketing 3d Modelling Event Management Internet Research Brand Management Sales Auditing Traffic Advertising Organic

© 2005 - 2020 getFreeLancer.com
14,104 contracts/jobs/projects currently available in our database.

There are 3 users online now.
Most online ever was 1568.